Abstract

This paper presents the system performance evaluation for HTTR gas turbine cogeneration test plant (HTTR-GT/H2 plant) so as to confirm that the design meets the requirements with respect to the demonstration test objective. Start-up and shut down operation sequences as well as operability of load following operation were investigated. In addition, system dynamic and control analyses for the test plant in the events of loss of generator load and upset of H2 plant were performed. The simulation results presented in the paper show that the test plant is suitable for the test bed to validate control schemes against postulated transients in the commercial Gas Turbine High Temperature Reactor Cogeneration (GTHTR300C). The results also lead us to the conclusion that HTTR-GT/H2 plant can be used to test operational procedures unique to HTGR direct-cycle gas turbine cogeneration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.