Abstract

Abstract This paper summarises the factors influencing the well design for a high pressure high temperature (HPHT)* field development using a Not Normally Manned Installation (NNMI) in the UK sector of the Central North Sea (CNS).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call