Abstract
Abstract This work tests the robustness of policies and procedures designed to protect South Australia's marine environment through a case study of the Adelaide Desalination Plant—the most expensive (∼A$1.8 billion) infrastructure project in South Australia's history. Although this project has been subject to an Environmental Impact Assessment (EIA)—the highest level of assessment in Australia—on inspection it appears that the current operating licence for the desalination brine discharge breaches Government approval conditions and ignores the collective expert scientific advice of the project's Environmental Impact Statement (EIS). Hence, the EIA process in South Australia for this project is flawed. Improvements could be made to the South Australian system by including the requirements for operating licences as an integral part of the EIA.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.