Abstract

Abstract I analyze the determinants of the stated capital cost of IPPs' power projects which significantly influences their price of power. I show that IPPs face a strong incentive to overstate their capital cost and argue that effective competition or regulatory scrutiny will limit the extent of the same. I analyze the stated capital costs of combined cycle gas turbine (CCGT) IPP projects in eight developing countries which became operational during 1990–2006 and find that the stated capital cost of projects selected without competitive bidding is 44–56% higher than those selected with competitive bidding, even after controlling for the effect of cost differences among projects. The extent to which the stated capital costs of projects selected without competitive bidding are higher compared those selected with competitive bidding, is a lower bound on the extent to which they are overstated. My results indicate the drawbacks associated with a policy of promoting private sector participation without an adequate focus on improving competition or regulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.