Abstract
Purpose Particle therapy has potentially a better therapeutic ratio than photon therapy. However, investment costs are much higher. This study provides an estimation and comparison of the costs of these therapies. Methods Within an extensive analytical framework capital and operational costs, cost per fraction, and four tumor specific treatment costs are calculated for three facilities: combined carbon-ion/proton, proton-only, and photon. Results Capital costs for the combined, proton-only and photon facilities are: € 138.6 million, € 94.9 million, € 23.4 million. Total costs per year are: € 36.7 million, € 24.9 million, € 9.6 million. Cost per fraction is: € 1128 (€ 877–1974), € 743 (€ 578–1300), € 233 (€ 190–407). Cost ratio particle/photon therapy is 4.8 for the combined and 3.2 for the proton-only facility. Particle treatment costs vary from € 10,030 (c-ion: lung cancer) to € 39,610 (proton: head & neck tumors). Cost difference between particle and photon therapies is relatively small for lung and prostate cancer, larger for skull-base chordoma and head & neck tumors. Conclusion Investment costs are highest for the combined carbon-ion/proton facility and lowest for the photon facility. Cost differences become smaller when total costs per year and specific treatment costs are compared. Lower fractionation schedule of particle therapy might further reduce its costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.