Abstract

It comprises 3 basements and 35 upper storeys, of which 17 are designed for the hotel and a further 15 for apartments, both functions being separated by a technical floor. In the top two levels, a restaurant has been set up, from where a splendid panoramic view of the AIps is given. Prefabrication predominates in the construction, and only the central nucleus of vertical Communications and perimetral supports were made with concrete mixed on site. Thanks to this system, this 118 m high building was completed in only nine months. The execution of the prefabricated components, such as the parts making up the pugging and the semicircular cantilevers of the terraces, took place in a provisional factory set up in the work area, and which was equipped with a steam plant to achieve the quick setting of the precast parts. On the outside, the new hotel offers the town a lively touch, due in part to the original arrangement of the terraces which jut out like a honeycomb, from the circular block of the building.

Highlights

  • Alemania Federal© Consejo Superior de Investigaciones Científicas Licencia Creative Commons 3.0 España (by-nc) http://informesdelaconstruccion.revistas.csic.es sinopsis

  • Aeusserlich verleiht das neue Hotel dem Stadtbild einen heiteren Charakter, zum Teil wegen der originellen, zellenartigen Anordnung der vorspringenden Terrassen des kreisformigen Gebáudeblocks

  • It comprises 3 basements and 35 upper storeys, of which 17 are designed for the hotel and a further 15 for apartments, both functions being separated by a technicai floor

Read more

Summary

Alemania Federal

© Consejo Superior de Investigaciones Científicas Licencia Creative Commons 3.0 España (by-nc) http://informesdelaconstruccion.revistas.csic.es sinopsis. Este núcleo se realizó mediante un encofrado deslizante llevándose su construcción con un adelanto de dos o tres plantas respecto al resto de la obra, para así poder ir instalando sucesivamente la grúa-trepadora y continuar, con su http://informesdelaconstruccion.revistas.csic.es ayuda, la colocación de las piezas de forjado de los niveles inferiores. Simultáneamente con estos trabajos, se avanzaba en la construcción de una planta más del núcleo central, y se continuaban los trabajos en la fábrica provisional para obtener nuevos elementos prefabricados. En las dos plantas más altas del edificio, aprovechables como terrazas panorámicas, se ha abierto un restaurante, desde el cual, en los días claros, se ofrece al visitante unas espléndidas vistas sobre los Alpes, desde el lago Constanza hasta el paisaje de la Baviera Superior. A l'extérieur, le nouvel hotel confére un caractére animé au profil de la ville, dü en partie a la disposition origínale des terrasses en porte-á-faux, sous forme d'aivéoles, du bloc circulaire de l'immeuble

Congress Hotel in Aussburg Federal Germany
Kongresshotel in Augsburg Bundesrepublick Deutschland