Abstract

Chain type coal-fired hot blast furnace boiler has a strong coupling, large delay, large inertia characteristics. Control effect of control method of mathematic modeling method and the classical routine of it is very difficult to produce the ideal. The predictive control theory combined with neural network theory. Through the model correction and rolling optimization control method of the system is good to overcome the effects of model error and time-varying process. The experimental results showed that neural network predictive control system is improved effectively the static precision and dynamic characteristic. It has better practicability of boiler temperature of this kind of large time delay system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.