Abstract
There are no standardized measures of hospital disaster preparedness or hospital "surge capacity." To characterize disaster preparedness among a cohort of hospitals in Los Angeles County, focusing on practice variation, plan characteristics, and surge capacity. This was a descriptive, cross-sectional survey study, followed by on-site verification. Forty-five 9-1-1 receiving hospitals in Los Angeles County, CA, participated. Evaluations of hospital disaster plan structure, vendor agreements, modes of communication, medical and surgical supplies, involvement of law enforcement, mutual aid agreements with other facilities, drills and training, surge capacity (assessed by monthly emergency department diversion status, available beds, ventilators, and isolation rooms), decontamination capability, and pharmaceutical stockpiles were assessed by survey. Forty-three of 45 hospital plans (96%) were based on the Hospital Emergency Incident Command System, and the majority had protocols for hospital lockdown (100%), canceling elective surgeries (93%), early discharge (98%), day care for children of staff (88%), designating victim overflow areas (96%), and predisaster "preferred" vendor agreements (96%). All had emergency medical services-compatible radios and more than three days' worth of supplies. Fewer hospitals involved law enforcement (56%) or had mutual aid agreements with other hospitals (20%) or long-term care facilities (7%). Although the vast majority (96%) conducted multiagency drills, only 16% actually involved other agencies in their disaster training. Only 13 of 45 hospitals (29%) had a surge capacity of greater than 20 beds. Less than half (42%) had ten or more isolation rooms, and 27 hospitals (60%) were on diversion greater than 20% of the time. Thirteen hospitals (29%) had immediate access to six or more ventilators. Less than half had warm-water decontamination (42%), while approximately one half (51%) had a chemical antidote stockpile and 42% had an antibiotic stockpile. Among hospitals in Los Angeles County, disaster preparedness and surge capacity appear to be limited by a failure to fully integrate interagency training and planning and a severely limited surge capacity, although there is a generally high level of availability of equipment and supplies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.