Abstract

This paper presents a method to calculate the pressure generated by submerged backfill on barricades (or bulkheads) located in drifts at the base of mine stopes. The paper complements Part I (see companion paper, this isue), which presents an analytical solution for the pressure on barricades when the backfill is in drained conditions (after the pore-water pressure has dissipated). The solution presented here applies shortly after backfill deposition, for undrained conditions. In this case, the effect of pore pressure cannot be neglected as it may be critical for the response of barricades. The solution is developed for totally or partly submerged backfill (with the water table at various elevations). Experimental testing and numerical modelling results are used to validate the proposed equations. Both numerical and analytical results show that the total pressure on barricades can be significantly increased by pore pressure, while the effective stress is decreased in the access drifts (compared to dry or drained conditions). The proposed solution provides a simple method to obtain a realistic estimate of the total and effective stresses, and can thus be used as a basis for barricade design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.