Abstract

Abstract Planning a carbon capture and storage (CCS) project that meets economic criteria and minimizes risk requires a systematic analysis of the full-value chain, including capture, transport, storage, formation characteristics, well number and type, formation integrity, well integrity, and monitoring, as well as abandonment, government regulations, and public constraints. The complex process of planning a CCS project that meets multiple objectives and honors multiple constraints involves a large number and variety of decisions. This paper describes the use of front-end loading (FEL) and a fully-integrated asset model (IAM) to address these issues. It includes a study example of a coal-fired power plant and assessment of multiple storage sites, including saline aquifer and enhanced oil recovery candidates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.