Evasive contract phrases traditionally used in the general conditions of construction contracts require the contractor to idemnify and protect the owner and his agent (the engineer) against all claims regardless of the adequacy of the design, to investigate the site, design all temporary supporting structures, be liable for all damages, and assume all risks. This procedure developed in England during the late 18th Century with the Industrial Revolution as industry demanded uniform justice for expediency’s sake, holding that all risks could be adequately compensated. Prior to this, caveatory, disclaimer, and exculpatory phrases were not allowed in agreements. Contract disputes were adjudicated in courts of Equity which sought substantive fairness, justice, and equality for all parties regardless of the contract terms. The present system places engineering design responsibilities on the contractor which he is not professionally capable of bearing. Reform is needed, and it must come from the engineers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.