Abstract

Abstract : This report presents the results of the Phase II hydrogeologic survey at Hill Air Force Base (AFB), Utah which was accomplished under the U.S. Air Force Installation Restoration Program (IRP). The IRP Phase II Field Survey was conducted after the completion of an IRP Phase I Records Search by Engineering Science (1982). Thirteen disposal sites at Hill AFB were evaluated which were rated and prioritized by contamination potential. Of these sites, the U.S. Air Force selected the four highest priority waste disposal areas for initial Phase II investigation. The four waste areas selected were: (1) Chemical Disposal Pits No. 1 & 2, (2) Landfill No. 3, (3) Berman Pond, and (4) Chemical Disposal Pit No. 3. The report is presented in two volumes. Volume I is the text of the final report and Volume II contains supporting the investigation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.