Abstract
Currently, there is not an understanding of the project factors having a statistically significant relationship with highway construction duration. Other industry sectors have successfully used statistical regression analysis to identify and model the project parameters related to construction duration. While the need is seen for such work in highway construction, there are very few studies which attempt to identify duration-influential parameters and their relationship with the highway construction duration. The purpose of this work is to describe the highway construction data needed for such a study, identify a data source, collect early-design project data, and prepare the data for statistical regression analysis. The Virginia Department of Transportation is identified as the optimal data source. The data collected include historical contract and project level parameters. To prepare for statistical regression analysis, the contract duration collected is converted to construction duration by a seasonal adjustment process which removes historically typical nonworking days.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.