Abstract

The incinerator at the T.Z. Osborne Plant in Greensboro, North Carolina burns sludge from its own waste water treatment plant and sludge pumped from the nearby North Buffalo plant. The two plants have a combined capacity of 36 million gallons per day of wastewater. Because of the age of and increasing high maintenance on the existing multiple hearth incinerator, and the need to increase treatment capacity, the Osborne plant concluded a study in 1992 evaluating its options for future municipal sewage sludge disposal. Options which were evaluated during the study included; (i) rehabilitation of the existing eight-year old multiple hearth unit; (ii) addition of a new multiple hearth; (iii) addition of a new fluid bed system; (iv) drying, composting, or land application. The chosen option, based on both economic and environmental considerations, was a new fluid bed system with a capacity of 2.55 tons per hour, approximately double that of the existing multiple hearth. Design of the new fluid bed system began in December 1994 and equipment delivery for the incineration system was begun in April 1995. Initial operation occurred in August 1996. Primary and secondary sludge, dewatered to 28% dry solids by centrifuge, is delivered by piston pumps to the twenty-foot freeboard ID incinerator. A shell and tube heat exchanger recuperates heat from the exhaust gas and preheats the combustion air to 1250°F, resulting in minimal auxiliary fuel use. The air pollution control device is a high-energy Tandem Nozzle® scrubber. Greensboro was the initial installation of this scrubber design on a fluid bed incinerator and its characteristics and performance are discussed. Ash is dewatered in an ash thickener/belt press system prior to disposal to landfill. The system includes a state of the art Programmable Logic Controller (PLC) system for computer control of the operation. The unit was commissioned in August 1996 and has been in continuous operation since that time except for a one week inspection and maintenance shutdown in February 1999. The plant operates 24 h/day, 7 days per week. The initial performance test showed the system to readily meet federal and state air emission standards. Particulate released was 0.002 grains per dry standard cubic foot, carbon monoxide was 22.5 parts per million volumetric (ppmv) and opacity was 0.4%. These results show a significant emission reduction with the fluid bed when compared to the multiple hearth. Annual tests conducted since then and continuous emission monitoring have shown the unit to be in consistent compliance. Since the fluid bed system became operational, the old multiple hearth system has been maintained on standby as a backup, but its use has not been required. Operational experience is discussed, the most interesting of which is the relatively trouble-free operation. The minor problems which occurred and their solutions are detailed. Also included is a comparison of operation and maintenance experience of the fluid bed and the multiple hearth. Current sludge disposal actual cost data are also provided including the average cost per ton of dry solids treated. The almost three years of operational experience to date has shown that the decision to install a new fluid bed system was the correct one on both an environmental and economic basis. It has provided benefits to all interested parties — the wastewater treatment plant, the regulators, the taxpayers, and the surrounding community.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.