Abstract
This paper describes the practical application of the UHF Partial Discharge Detection method that VA TECH Reyrolle has routinely applied to high-voltage on-site commissioning tests on gas-insulated substations (GIS) for over 10 years. The location of the partial discharge (PD) sensors has a significant effect on the sensitivity of the UHF method. Research has been undertaken to quantify the parameters that affect this, i.e., attenuation, GIS geometry, etc. Verifying the correct operation of the detection system and its sensitivity is a crucial step in preparing for an HV test. In order to do this, special test equipment has been developed to ensure that all of the cabling, connections, etc. attached to the detection equipment are correct and the detection level of the couplers confirmed. The paper discusses IEC 60517 (general guidelines for GIS HV testing), its most usual interpretation, and how the application of the UHF technique can transform this interpretation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.