ABSTRACT This paper reviews Mobil Oil Indonesia's experience in the completion o£ high temperature, high rate gas wells, gained during ten years as operator for the Arun Field. Over 50 production and injection wells have been completed in the Arun Field, and some of these wells have been worked over once or even twice since their initial completion. Problems which have been encountered during the operation or workover of the wells have led to changes in completion practices and equipment design. These problems are described in detail as are the. subsequent completion changes and the results of these changes.