Abstract

We performed a two-year case study on the ramp-up of a large flexible assembly system in a Midwestern automotive components plant. The new system was designed to be a creative replication of technology already in operation in the technology supplier's firm and was purchased under a broad corporate alliance agreement as well as a detailed adoption contract. Although the project met its installation schedule, production targets, and direct labor cost savings objectives, the installation of this innovative, partially-tended assembly system raised several issues and questions regarding the optimal part mix schedule, quality standards, and maintenance schedules. We hypothesize that a curvilinear relationship exists between supplier-user satisfaction and flexibility outcomes. Moderate levels of satisfaction appear to maximize the ratio of part families per hour change-over capability of a new flexible system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.