Abstract

Considering the growing demand for electricity in industrial parks, understanding their electric power load patterns is critical for improving energy efficiency and ensuring the rational utilization of energy resources. However, the detailed electric power load data of various buildings in industrial parks are rarely available and accessible, which hinders the related studies. In this context, we present the electric power load data of 6 years (from January 1, 2016 to December 31, 2021) for various types of buildings in an industrial park in Suzhou, China. The data are obtained from smart meters and have various time resolutions (i.e., 5 minutes, 30 minutes, and 1 hour). This work describes the data collection, processing process, and different imputation methods. The high-resolution electric power load data can be used for various research tasks, including load prediction, load pattern recognition, anomaly detection, and demand response strategy development.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call