Abstract

The Fusion Materials Irradiation Test (FMIT) deuteron linac, operating at 35 MeV and 100 mA continuous duty, is expected to spill 3 μA/m and to lose 10 μA at specific bending-magnet positions. The major impact of this spill will be felt in the High-Energy Beam Transport (HEBT), where many beam-line components must be maintained. A modular design concept, that uses segmented termination panels remotely located from the modules, is being employed. Radiation-hardened quadrupoles can be opened, clamshell fashion, to release the water-cooled beam tube r replacement if there is beam damage or lithium contamination from the target. Termination panels contain electrical, water, and instrumentation fit-tings to service the module, and are positioned to allow room for neutron-absorbing shielding between the beamline and the panel. The modular construction allows laboratory prealignment and check-out of all components on a structural carriage and is adaptable to supporting gamma shields. Proper choice of beam tube materials is essential for controlling activation caused by beam spill.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.