Abstract

The traditional synchronous trigger of blasting shock wave field is lineate. Because distributed range of testing field is very wide, the cost is high, disposing line is very inconvenient, reliability of testing system is at a discount. Now a more power node acts as synchronization trigger which starts up all sensor nodes isochronously by broadcast. The author named a synchronization technology as priority sequence. Single broadcast synchronization precision measuring experiment is made by the same testing method as Elson. The new experiment result is the error accord expectation , standard deviation normal school. The standard deviation is 6.8 of Elsons. The precision is exceed demand of shock wave field testing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.