Abstract
The Stanford Linear Accelerator Center (SLAC) version of the 1 TeV next linear collider (NLC) requires a 4:1 increase in drive frequency, from the 2.85 GHz of the 1 TeV Stanford Linear Collider (SLC) to 11:4 GHz for the NLC. More than eight years have gone into the development of a new 75-MW klystron for powering the NLC. The increase in power density and surface RF gradient at the higher frequency have rendered previous RF window and circuit designs unusable. Following numerous catastrophic gun, cavity, and window failures, new designs have evolved that solved the problems. As history's most ambitious klystron development enters its last year, the result includes a robust 75-MW peak power solenoid-focused, 50% efficient klystron. Not far behind is a 60-75-MW periodic permanent magnet (PPM)-focused 60% efficient version that will reduce the NLC electric power bill by tens of millions of dollars per year.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.