Abstract

As the number of daily satellite service requests increases, the satellite range scheduling problem becomes more intractable during the ground station operations management. The NP-complete problem involves scheduling satellite requests to ground station antennas within their time windows so that the profit from the scheduled requests is maximized. This paper analyzes various conflicts between satellite requests and then develops a conflict-resolution technique. The technique first builds an elite initial schedule using a prescheduling strategy and then improves the initial schedule using a rescheduling strategy in a subspace of feasible solutions. The main highlight of the technique is its dual functions of quickly generating a high-quality solution and providing a good bound. As shown in the experimental results from the actual data and more difficult random instances, the proposed technique is significantly better than the best-known heuristic.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.