Abstract

High-power negative and positive ion-based neutral beam injectors (NBIs) are operated with high reliability in the Large Helical Device (LHD). The total injection power is >20 MW, and such high-power beams are available every 3 min. The high performance of the LHD NBI system has extended the LHD parameter regime to levels equivalent to those obtained in large tokamaks. Three negative NBIs inject a total power of 16 MW with an energy of 180 keV, which is the world’s highest power from a negative NBI system (H−), and one positive NBI (H+) injects 7 MW at 40 keV. The injection duration can be extended beyond 1 min with reduced power from the negative and positive NBIs, and long-pulse plasmas are successfully sustained with the NBIs. The structure and performance of the LHD NBI system is reviewed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.