Abstract
High-power negative and positive ion-based neutral beam injectors (NBIs) are operated with high reliability in the Large Helical Device (LHD). The total injection power is >20 MW, and such high-power beams are available every 3 min. The high performance of the LHD NBI system has extended the LHD parameter regime to levels equivalent to those obtained in large tokamaks. Three negative NBIs inject a total power of 16 MW with an energy of 180 keV, which is the world’s highest power from a negative NBI system (H−), and one positive NBI (H+) injects 7 MW at 40 keV. The injection duration can be extended beyond 1 min with reduced power from the negative and positive NBIs, and long-pulse plasmas are successfully sustained with the NBIs. The structure and performance of the LHD NBI system is reviewed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.