Abstract

New kicker magnet systems and their related technologies are being developed and tested at KEK. The kickers are to be used both for the injection and for the fast extraction of two rings, the 50GeV proton synchrotron in the ‘Joint Project’ of JAERI–KEK and the PRISM/FFAG ring for the muon beam. In order to obtain a sufficient kick on the high-intensity beam in the 50GeV proton ring, the kicker systems must have both large apertures and high fields. In addition to this, the PRISM/FFAG ring demands muon beams with a high repetition rate of injection and extraction. The requested repetition rate is 1kHz or higher.In order to fulfill those demands, new technologies have been introduced and are now being tested. Among them are high-power IGBT modules, a subordinated-gating system, 1kHz repetition pulsed power supply, and kickers with magnetic-alloy cores used as return yokes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call