Abstract

In order to improve the operation efficiency of power system and reduce the operation performance of power system, a new hierarchical optimal scheduling method of regional integrated energy power system based on multi-objective particle swarm optimization algorithm is proposed in this paper. Aiming at the economic goal of regional integrated energy power system dispatching, the regional integrated energy power system dispatching objective function is constructed, and the constraints are constructed from three aspects: Branch power flow constraint, upper power grid injection power and power system gas turbine. The multi-objective particle swarm optimization algorithm is used to optimize the optimization model, build the upper and lower optimization models, and the multi-objective particle swarm optimization algorithm is used to complete the optimization. The experimental results show that compared with the traditional optimal scheduling method, the text method can improve the operation efficiency of power system and reduce the operation cost of power system, which shows that the practical application performance of this method is strong.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.