Abstract

This study investigates a berth allocation problem considering the periodic balancing utilization of quay cranes in container terminals. The proposed model considers that the quay cranes allocated to a work shift should be fully used and other real-world considerations, such as the continuous quay line, the penalties for early arrivals and departure delays. To solve the model, several heuristics are developed: the model for large problems is decomposed into sub-models that are solved by rolling-horizon heuristics; neighborhood search heuristics are used for optimizing a berthing order of vessels; parallel computing is used to improve the algorithmic performance. The method performs well when applied to real-world large-scale instances with promising computation time that is linearly related to the number of vessels.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.