Abstract
Disassembly is a major activity performed in treatment and recovery facilities and is the most important precedence of product and recovery part. This paper focus on single-item disassembly lot sizing problem with lost sales, we propose an optimisation approach to minimise the set-up costs and inventory costs in a first time and in second time we include lost sales costs. To this end, we propose three most well-known heuristic approaches for the single-item disassembly lot sizing problem with lost sales: silver meal (SM), part period balancing (PPB) and least unit cost (LUC). Results show that the heuristics used in the classical lot sizing problem can be also used to solve the disassembly lot sizing problem with lost sales, especially for small and medium instances. Results also show that can trust the proposed heuristics as a solution methodology to solve disassembly lost sizing without and with lost sales for larger instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.