Abstract

Wire rod and bar rolling is an important batch production process in steel production systems. A scheduling problem originated from this process is studied in this work by considering the constraints on sequence-dependent family setup time and release time. For each serial batch to be scheduled, it contains several jobs and the number of late jobs within it varies with its start time. First, we model a rolling process using a Petri net (PN), where a so-called rolling transition describes a rolling operation of a batch. The objective of the concerned problem is to determine a firing sequence of all rolling transitions such that the total number of late jobs is minimal. Next, a mixed-integer linear program is formulated based on the PN model. Due to the NP-hardness of the concerned problem, iterated greedy algorithm (IGA)-based methods by using different neighborhood structures and integrating a variable neighborhood descent method are developed to obtain its near-optimal solutions. To test the accuracy, speed, and stability of the proposed algorithms, we compare their solutions of different-size instances with those of CPLEX (a commercial software) and four heuristic peers. The results indicate that the proposed algorithms outperform their peers and have great potential to be applied to industrial production process scheduling. <italic xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">Note to Practitioners</i> —This work deals with a scheduling problem of a batch production process, i.e., wire rod and bar rolling, which is modeled by a Petri net (PN). Due to the NP-hardness of the concerned problem, four iterated greedy algorithm-based methods are developed to solve it. The proposed methods are validated and tested by comparing their solutions with those of four heuristic peers and the exact ones (when available via CPLEX). Extensive experimental results show that they can fast solve one-week-scale instances with better performance than their peers’, thereby proving the readiness to put them in industrial use. When solving a one-month-scale instance, the proposed methods show much better performance than others.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.