Abstract

<p>Planning of high voltage direct current (HVDC) grids requires inclusion of reliability assessment of alternatives under study. This paper proposes a methodology to evaluate the adequacy of voltage source converter/VSC-HVDC networks. The methodology analyses the performance of the system using N-1 and N-2 contingencies in order to detect weaknesses in the DC network and evaluates two types of remedial actions to keep the entire system under the acceptable operating limits. The remedial actions are applied when a violation of these limits on the DC system occurs; those include topology changes in the network and adjustments of power settings of VSC converter stations. The CIGRE B4 DC grid test system is used for evaluating the reliability/adequacy performance by means of the proposed methodology in this paper. The proposed remedial actions are effective for all contingencies; then, numerical results are as expected. This work is useful for planning and operation of grids based on VSC-HVDC technology.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.