Abstract

Abstract This paper considers the planning of individual machine groups or work centers producing many different products such as components, subassemblies or assemblies. The deterministic multi-item lot size problem with limited capacity has attracted much attention during the past two decades but no efficient optimization techniques are available up to now. We therefore suggest an efficient heuristic which is an extension of the Eisenhut heuristic. The resulting production programs always adhere to the characteristics of the dominant schedules. Special attention is given to the characterization of these dominant schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.