Abstract
In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.