Abstract

In this paper, we present an industrial problem found in a company that produces acrylic fibres to be used by the textile industry. The problem is a particular case of the discrete lot sizing and scheduling problem (DLSP). In this problem, lots of similar products must be generated and sequenced in ten unrelated parallel machines, in order to minimize tool changeovers and the quantity of fibre delivered after the required due date. The company problem is original because a changeover can occur between two lots of the same product due to tool wear. We analyse the problem in detail and present an adaptation of a heuristic found in the literature to solve it. Results obtained with the proposed heuristic are compared with results that used to be obtained by the production planner, using historical data.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.