Abstract

Heron Tower is a new landmark office building in the City of London which is due for completion in February 2011. With 47 storeys above ground and a total height of 232 m, it exceeds Tower 42, which has held the city record for the past 30 years. A steel stability tube structure encloses the office floor plates, carrying vertical and lateral loads to a secant pile wall at ground level, which forms the perimeter of a three-storey basement. This paper describes the construction strategy devised by the designers, with top-down basement construction concurrent with superstructure erection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.