Abstract

AbstractThe Koralm Tunnel (length 33 km) crossing the eastern Alps is part of the Koralmbahn line and one of the longest rail tunnels in the world. The installation of railway equipment in the tunnel is due to start soon and it is particularly important to now make current decisions considerung future developments and demands. In particular the conflicting goals of the scheduling horizon of the construction permit process nearly 20 years ago, the 150‐year design horizon and the rapid development of electronics, data processing and telematics have to be considered. Experience of operation of long rail tunnels confirms that despite all logistical efforts, the maintenance of railway equipment leads to a great expense of time and finance and also to restrictions of the line availability for operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.