Abstract

This paper examines thermal performance of a ground source heat pump (GSHP) system. The GSHP system was installed in an office building in Nuremberg city of Germany. In order to evaluate system performance the GSHP system has been continuously monitored for 4 years. Heating and cooling performance of the GSHP system is analyzed based on the accumulated data.Major findings of this work include: (1) coefficient of performance (COP) is estimated to be 3.9 for a typical winter day and energy efficiency ratio (EER) is assessed to be 8.0 for a typical summer day. These results indicate that the GSHP system has a higher efficiency for building cooling than building heating. (2) For a long-term period, the seasonal energy efficiency ratio (SEER) of the GSHP system is observed to increase by 8.7% annually, whereas the seasonal COP is decreased by 4.0% over a 4-year period. The heating and cooling performance of the GSHP system migrates in opposite trend is caused by the unevenly distributed heating and cooling load of the building. This phenomenon deserves serious attention in the design of future GSHP systems in order to avoid the reducing of energy efficiency over long-term operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.