Abstract
The reheating part of the moisture separator-reheater (MSR) of nuclear power plant (NPP) steam turbine occupies a significant part of MSR volume and requires large consumption of metal. The superheating of low pressure steam provides by the high pressure steam condensation. This steam supplies partly from turbine inlet and partly from turbine stage bleeding because of two superheater stages. The significantly less heat transfer intensity at the single-phase side of reheater comparatively with condensation side requires intensification of heat transfer from the heated-steam. For such goal the different methods can be used: for instance the cross flow of the coiled tubes and finning of straight tubes bundles. Also is perspective the usage of artificial roughness in form of small “moons” and other types of artificial roughnesses.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.