Abstract

Abstract To solve the heat straying problem of constructed wetland in north China, a series of measures was adopted in an engineering application case. The operation results showed that, after using the heat preservation measures, vertical current constructed wetland in the north went through the winter safely, and the gas exchanged with the air by water into and out efficiently, remitting oxygen inadequacy in the bed, greatly improving the pollution removal. In terms of the effect, the removal efficiency in winter was similar to that in summer, with little variation. The average removal rates of COD, NH4+-N and TP were 90.85%, 98.38% and 89.68% respectively, and the quality of effluent achieved the national emission standard.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.