Abstract
This paper presents a state-of-the-art review on grid connection of large offshore wind power plants (OWPPs) using extra-long high voltage AC (HVAC) cables. The paper describes research by DONG Energy Wind Power in close collaboration with Aalborg University addressing related challenges through an industrial PhD project. The overall goal is to gain a better understanding of extra-long HVAC cable connected OWPPs, in order to ensure reliability and availability of OWPPs. This will reduce the cost of energy, as the risk of costly delays and modifications after the project has been commissioned can be reduced and operational availability and the reliability can be improved. Challenges hereto include lower resonance frequencies due to the long cables, frequency dependent modelling of long submarine cables, passive filtering, and PLL dynamics in the control loops (from a harmonic stability point of view).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.