Abstract

The Hangzhou Jiangdong Bridge is a self-anchored suspension bridge with spatial main cables. The incremental launching method was used to erect the steel box girder, while five pairs of temporary hangers were utilized to laterally pull apart two main cables from the vertical plane to an inclined plane. System transformation is the key construction technology in this bridge. Many problems were solved satisfactorily for the spatial main cable system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.