Abstract

A full-scale prototype surface barrier has been constructed at the 200 BP-1 Operable Unit in the 200 East Area of the Hanford Site. The prototype barrier has been built to evaluate design, construction, and performance features of a surface barrier that may be used for in-place disposal of wastes at the Hanford Site. The design basis and construction of the prototype have been documented. A testing and monitoring plan has been published outlining specific tests planned for the prototype. The current report describes initial testing activities conducted in FY 1994 and outlines activities for testing and monitoring at the prototype barrier in the future. Asphalt permeability was tested during construction of the prototype in April and May 1994. Cores taken from the asphalt concrete layer were tested in the laboratory and found to have hydraulic conductivities below 1E-09 cm/s. Field measurements of hydraulic conductivity taken on the asphalt concrete using a specially-designed falling head permeameter were more than ten times higher than those from core tests. The higher values are attributed to transient flow through the permeameter seal. In spite of this difficulty, the more rapid field measurements (1-day tests in the field compared to 3 months in the laboratory)more » gave values as low as IE-09 cm/s and averaged about IE-08 cm/s. Samples of fluid-applied asphalt material, used as a sealant on the asphalt concrete layer, were. tested in the laboratory and found to have hydraulic conductivities below IE-10 cm/s. Measurements of hydraulic conductivity taken on an adjacent asphalt test pad using a sealed double-ring infiltrometer (SDRI) were initiated in September 1994 and are expected to be completed in November 1994. Construction of the prototype surface barrier was completed in August 1994.« less

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call