Abstract

Because of the progressively greater distances from sources of hydroelectric power to large load centers, there is a constant search for more efficient and less costly means of long-distance transmission. This paper proposes a half-wavelength transmission system for point-to-point transmission of power to eliminate many of the operational and design problems associated with conventional long transmission lines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.