Abstract
Because of the progressively greater distances from sources of hydroelectric power to large load centers, there is a constant search for more efficient and less costly means of long-distance transmission. This paper proposes a half-wavelength transmission system for point-to-point transmission of power to eliminate many of the operational and design problems associated with conventional long transmission lines.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.