The H-02 Wetland Treatment System (Figure 1) is used to remove heavy metals (e.g., copper and zinc) from the H-Area process and storm water discharge. Routine flow enters an equalization basin by inlets on either the east (Location 1) or west end (Location 2). The west end influent constitutes 75% of the average flow into the basin which has an average residence time of approximately 3 days at low pool (i.e., 120 gal/min. through a volume of 0.5 million gallons). The water then exits via the basin outlet on the east end. Next, the water flows to a splitter box (Location 3) which evenly separates the flow between two wetland cells for a design flow of 60 gal/min. per wetland cell with a residence time in the cell of approximately 2 days. The wetland effluent is then combined (Location 4) and flows through a spillway before reaching the National Pollution Discharge Elimination System (NPDES) measurement point near Road 4. During initial operation, it was observed that the pH of the water leaving the equalization basin was elevated compared to the influent pH. Furthermore, the elevated pH remained through the wetland cells so that there was an average pH of 10 leaving the wetland cells during the daytime which exceeds the upper NPDES limit of 8.5. The purpose of the current study was to evaluate the cause of the increase in pH within the equalization basin of the H-02 Wetland Treatment System. Possible mechanisms included algal activity and inorganic chemistry interactions (e.g., interactions with the clay and/or bentonite liner). Water quality parameters were evaluated throughout the H-02 Wetland Treatment system and over time in order to determine the cause of high pH values measured in the basin and wetland. Fluctuations in dissolved oxygen (DO) and accompanying changes in pH would be expected in systems where algae are an influencing factor. An unexpected increase or decrease in the concentration of inorganic substances may indicate operational changes or an inorganic chemistry influence on pH. In addition, alternative methods to alleviate or mitigate the pH increase were evaluated. This study documents the results of sampling activities undertaken and conveys the analytical results along with suggestions for operation of the H-02 Wetland Treatment System. The water samples collected and the water quality data generated from this activity are for analytical purposes only, and as such, were not collected in support of compliance activities.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call