Abstract

Abstract Abstract The disposal of waste gypsum wallboard at landfill sites in British Columbia (B.C.), Canada, resulted in the generation of hydrogen sulphide gas and toxic leachates. Although some remedial measures were taken to reduce or eliminate problems resulting from past dumping practices, many landfill operators refused to accept new waste for fear of litigation over the pollution of nearby streams and rivers. with the availability of legitimate disposal sites greatly reduced, a serious waste management problem arose. the two most promising options for reducing the accumulating waste appeared to be recycling and ocean disposal. Agricultural use of the waste for soil conditioning would account for only a small portion of the waste generated annually. Manufacturing plants were reluctant to accept waste gypsum with a high paper fibre content for fear it would lower the quality of the new wallboard product or interfere with the existing equipment and processes in the plants. the technology for economi...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.