Abstract

SUMMARY Early studies concerning the sand producing tendencies of the Gullfaks reservoirs concluded that wells should be completed with sand control measures from the start of production. Results from a newly developed Computer Based Sand Production Prediction Model indicated that the Rannoch sands could be produced sand-free through natural completions. Specific guidelines must be followed in the design of the completion and also included in the reservoir management programme. The production phase of Gullfaks commenced with 4 subsea production and one subsea injection well, completed by selective perforation with high completion efficiency. The model prediction of no sand production has been confirmed by results from all wells after 6 months of production. This paper reviews the field implementation of the guidelines from the model for the 4 subsea wells completed in the Rannoch sands.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.