Abstract

Abstract The sustained, increasing world energy demands have led to very high oil prices. In parallel, there has been a significant increase in interest in economic and environmentally sensitive solutions for the monetization of remote, stranded gas offshore. Current global natural gas reserves total approximately 6,100 tcf, according to EIA estimates. Roughly half of these are considered to be stranded gas that is uneconomical for market delivery due to the remote location of potential markets, lack of economic transportation and infrastructure, or lack of conversion technology. Such regions with significant stranded gas reserves include Northern Australia, Vietnam, and Indonesia. GTL (Gas-to-Liquids) FPSO (Floating Production Storage and Offloading) offers an attractive new solution to monetize these remote, offshore, stranded gas fields. Products of the GTL process are clean transportation fuels ranging from diesel to jet fuel that can be readily used in the existing energy infrastructure. Although this option has been considered in the past by Syntroleum and Statoil in mid-2000, a reexamination of this option is warranted due to recent advances in both GTL and FPSO technology. New GTL commercial plants have recently begun production in Qatar, utilizing technologies by Sasol and Shell with the latest advances in the process technologies and catalysts. Membrane and Process Intensification technologies show considerable promise in making GTL an attractive option in the future. The newly built Oil FPSOs (Pazflor and Agbami) instill confidence that large oil and gas processing operations can be safely and economically performed on an FPSO. DSME has recently completed a feasibility study as part of a multi-year development program to acquire the basic technology and engineering for GTL FPSO. An assessment was made on the technical feasibility of commercial and near-commercial-scale technologies, and a preliminary design concept of the GTL process was produced for the topside. This study utilized technologies that best met the needs of the FPSO application and the corresponding preliminary design concept of the hull to support the topside GTL process. Additionally, preliminary market analysis was performed to better define the scope of GTL products to be produced. Economic analysis was performed to identify the major cost factors and understand their sensitivity on Project economics. The results of this feasibility study to date suggest that this GTL FPSO design concept is technically feasible. Its clean fuel and chemical feedstock would be attractive to the market, and the design concept is economically competitive within the range of the current Project cost factors. Future work will be directed to develop a more definitive process, hull design, and Project economics, and will bring commercial realization of this innovative approach of monetizing offshore stranded gas fields.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call