During the planning stage of a tunnel, the permissible future water leakage into the tunnel is determined with regard to the hydro-geological conditions and existing structures. Detailed specifications are drawn up concerning tests and observations to be made during excavation, and the interpretation of their results, as a guide to the execution of the grouting works. A brief account is given of a specific contract on which methods and equipment for drilling and grouting are adapted to the exacting demands made on accuracy and efficiency. Monitoring of water leakage and groundwater levels is to be continued after the completion of the tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.