Abstract

Backfilling a giant karst cave with grouted engineering spoil as a new countermeasure for tunnels through giant karsts cave is studied in this paper. The numerical models of sections with different distribution characteristics of karst cave and tunnels are established for studying the deformation of surrounding rock and mechanical response of tunnel lining with and without grouting, respectively. The results illustrate that the countermeasure scheme is feasible. In order to ensure that the countermeasure can perform as expected effect, the inadequate grouting sections are recognized and verified using field grouting records and single-hole grouting quantity analysis. Finally, the application effect of the countermeasure scheme is evaluated by field monitoring of horizontal convergence. The result shows that the grouting can reduce the deformation of surrounding rock at the side wall and bottom of tunnel by 70–80% and reduce the stress redistribution range of surrounding rock. However, due to the great differences between the limestone and engineering spoil, the grouting cannot change the share of distribution of load between corresponding region surrounding rock, the max principle stress of tunnel lining is almost identical with and without grouting. The grouting reinforced engineering spoil backfill the giant karst cave can meet the requirement of excavation stability. The inadequate grouting sections caused by groundwater and through crack are identified effectively, and are verified by coring observation method. The horizontal convergence of the tunnel is less than 30 mm, and the stable state can be reached within 20 days, which demonstrate that the remarkable engineering results is achieved. The countermeasure of giant karst cave can provide a useful reference for similar project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call