Abstract

This work presents the experiences gained during the construction of the Perthus high-speed railway tunnel (8.4 km long), as regards water inflow management, analysis of the impact on surface-waters and groundwater, monitoring of piezometers and water quality control, soil injections. The excavation met granodiorites, schists, diorites, gneisses, black schists and coarse river deposits (pebbles and blocks) near the north portal. Some important tectonic structures, and associated groundwater flow, were also crossed. Finally, a geothermal study on the hydrothermal springs Le Boulou, which were not impacted, is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.