Abstract
Atmospheric discharges are indispensable for the electrical sector due to their responsibility on the shutdown of the power lines, what may trigger a sequence of events that led the interconnected electrical system to collapse. The aim of this case study is to demonstrate the development of a viable methodology in order to reduce the resistance values of the grounding system of the power lines, reducing shutdown occurrences due to returning disruptive discharges, or backflashover, mitigating the damages caused to the electrical system and to society, in order to improve the quality of the electrical power distribution. Considering the factors of implementation costs, technical environmental viability, the encompassment of this solution for other structures lines, and the reduction of the implementation percentage, it was concluded that the most adequate solution to implement a more robust grounding system in the transmission power lines is the solution 03 tested on the tower 585, with a reduction of 66,98%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal for Innovation Education and Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.